Sandstone Cleaning in Allambie Heights: your questions
Not answered here? Call 0494 810 609 or use the form and Nathan will reply personally.
Yes. Allambie Heights 2100 is on our Freshwater to Dee Why run and we are in Beacon Hill and North Balgowlah most weeks. We quote within one business day and book most Allambie Heights jobs within 7 to 10 days.
Pricing is on request. Allambie Heights properties range from post-war brick homes on quarter-acre blocks on the ridge above manly dam to much larger sites, so we measure from aerial imagery, test where needed and send one fixed written price.
On the hillside blocks the sandstone is mostly retaining walls, steps and garden edging that go black with lichen; low-pressure biocide cleaning restores the warm colour. The method is set for Allambie Heights conditions.
Not into the street. Allambie Heights drains to Manly Dam. We bund the kerb inlet, capture or redirect rinse water to garden, and vacuum-recover on sealed or commercial sites.
In hillside and village conditions like Allambie Heights, usually every 18 to 24 months. Shade, irrigation and aspect change that, so the quote puts a cycle in writing.
Because the dam side of the ridge drains into Manly Dam, a protected freshwater reserve. Nothing from a wash is allowed to reach it, so rinse water is captured or directed to garden beds on every job.
It will bring back the warm colour and banding by removing lichen and algae, but it will not erase old wand damage or weathering. We show you the result on a test patch before the full job.
Yes, written on every quote: if anything we quoted is not clean at handover we return within seven days and redo it free. We carry $20 million public liability and every Allambie Heights job has a named lead technician.

