Stone Sealing in Dee Why: your questions
Not answered here? Call 0494 810 609 or use the form and Nathan will reply personally.
Yes. Dee Why 2099 is on our Freshwater to Dee Why run and we are in North Curl Curl and Cromer most weeks. We quote within one business day and book most Dee Why jobs within 7 to 10 days.
Pricing is on request. Dee Why properties range from sydney's largest concentration of mid-rise strata on the peninsula: 1960s to 1990s walk-ups along howard and oaks avenues to much larger sites, so we measure from aerial imagery, test where needed and send one fixed written price.
Lagoon-side, sealing slows the algae by keeping water out of the stone, but it must be breathable so moisture from below can escape; film sealers fail fast here. The method is set for Dee Why conditions.
Not into the street. Dee Why drains to Dee Why Lagoon and Dee Why Beach. We bund the kerb inlet, capture or redirect rinse water to garden, and vacuum-recover on sealed or commercial sites.
In lagoon and estuary conditions like Dee Why, usually a re-seal every 3 to 5 years. Shade, irrigation and aspect change that, so the quote puts a cycle in writing.
Usually yes. Three and four storey blocks are reached with poles from the ground and from the balconies, which avoids a council road occupancy permit. Anything above that gets an EWP or rope access, and we handle the permit.
Not with the penetrating sealers we use; they sit inside the stone and leave the surface looking natural. A colour-enhancing version is available if you want a slightly richer tone.
Yes, written on every quote: if anything we quoted is not clean at handover we return within seven days and redo it free. We carry $20 million public liability and every Dee Why job has a named lead technician.

